DRAFT FILED: 7/26/00
FINAL APPROVAL: 9/20/00
VILLAGE OF CROTON-ON-HUDSON, NEW YORK
WATER CONTROL COMMISSION MEETING OF JUNE 21, 2000
A meeting of the Water Control Commission of the Village of Croton-on-Hudson, N.Y. was held on June 21, 2000.
MEMBERS PRESENT: Doug Garbarini, Chairman
Sally Odland
John Sasso
Stuart Greenbaum
Mark Goldfarb
The meeting came to order at 7:30 P.M.
APPROVAL OF MINUTES:
5/18/00 - Greenbaum - Made Motion to accept the minutes
Odland - Second the Motion
Vote: 4-1 In Favor - Greenbaum, Odland, Garbarini, Sasso
Abstained - Goldfarb
HEARING:
Peter Masselli, 350 Albany Post Road, Section 67.14 Block 3 Lot l. Request for a Wetlands Activity Permit with respect to a proposed new one-family dwelling.
After reviewing the plans and inspecting the site the Board agreed to grant a Wetlands Activity Permit.
Garbarini - Made Motion to grant a Wetlands Activity permit according to a previous Wetlands Permit granted on 6/7/90, with Condition #2 omitted. The Conditions are as follows:
1. No trees are to be removed except as necessary for the construction of
the house, driveway and septic fields.
2. Erosion control measures should be employed during and after
construction as recommended in the Westchester Best Management
Practices regarding erosion control.
Greenbaum - Second the Motion
Vote: 5-0 Sasso, Greenbaum, Garbarini, Goldfarb, Odland
DISCUSSIONS:
Feasibility Report:
Garbarini - Andrew Zelman of the Waterfront Advisory Committee, will be submitting a letter of recommendation to the Village Board with respect to the Feasibility Report. If anyone has any comments or recommendations they should submit them to Andrew Zelman.
Garbarini - Requested Stuart Greenbaum follow up with Rick Herbek and the Village Board with respect to the Feasibility Report, Bike Trails, etc.
Mr. Greenbaum - Agreed.
Railroad Ties:
Garbarini - On July 17, 2000, the Engineering Dept. of West Point, will be present at a Village Board workshop. I recommend that the Water Control Commission Members attend.
Boat Launch Project:
Garbarini - The Village is still in the process of obtaining approvals from the Department of State and the Army Corp of Engineers.
The final design plan for the Boat Launch has a larger ramp to accommodate larger trailers. The Water Front Advisory Committee thought it was consistent with objectives of the Waterfront Management Plans especially in regards to providing greater access to the River.
Duck Pond:
Garbarini - Suggested the W.C.C. invite John Goplerud to attend a meeting to discuss the Duck Pond.
Discussions Closed
Respectfully Submitted
Janice Fuentes
WCC Secretary
6/21/00
|