Number |
Code |
Description |
Date |
Size |
Picture (click picture for larger image) |
00118 |
NCD |
Stiff Legged Derricks Taken From Above Quarry |
N/A |
||
00119 |
NCD |
Man Poking Head Through Key Hole |
1889 |
8 X 9 |
|
00120 |
NCD |
Brick Wall Inside Key |
1889 |
9 1/2 X 7 1/2 |
|
00121 |
NCD |
Looking Westerly |
1889 |
9 1/2 X 7 1/2 |
|
00122 |
NCD |
Hollow To The Spring Line |
1889 |
9 X 7 1/2 |
|
00123 |
NCD |
Looking South At The Brickwork |
1889 |
9 X 7 1/2 |
|
00124 |
NCD |
A Cavity Accessible From Either Of Above Mentioned Holes In The Key |
1889 |
9 X 7 1/2 |
|
00125 |
NCD |
Instrument On Arch - East Haunch 1 foot below Crown. |
1889 |
9 X 7 1/2 |
|
00126 |
NCD |
Instrument In A Cavity Just West Of Key |
1889 |
9 X 7 1/2 |
|
00127 |
NCD |
The Brickwork Developed By Cutting Through The Key |
1889 |
9 X 7 1/2 |
|
00128 |
NCD |
Vertical Trenching For Core Wall |
1889 |
9 X 7 1/2 |
|
00129 |
NCD |
Horse And Buggy at Dam Site |
1896 |
4 X 3 |
|
00130 |
NCD |
Quarry Men Working With Granite |
1896 |
8 X 10 |
|
00131 |
NCD |
Excavating Foundation |
1896 |
8 X 10 |
|
00132 |
NCD |
Croton Dam Construction |
1896 |
8 X 10 |
|
00133 |
NCD |
Machines Working On New Foundation |
1896 |
8 X 10 |
|
00134 |
NCD |
Steam Shovel Working |
1896 |
8 X 10 |
|
00135 |
NCD |
Scenes Of Construction |
1896 |
8 X 10 |
|
00136 |
NCD |
Scenes Of Foundation - Steam Shovels Working In Hole |
1896 |
8 X 10 |
|
00137 |
NCD |
Excavating Foundation Of New Croton Dam - |
1896 |
8 X 10 |
|
00138 |
NCD |
Small Engine On Tracks To Quarry |
1896 |
8 X 10 |
|
00139 |
NCD |
Canney's Horses Dam Site |
1896 |
8 X 10 |
|
00140 |
NCD |
The Present Condition Of The Work On The Great Croton River Dam |
1896 |
8 X 10 |
|
00141 |
NCD |
Construction At The New Croton Dam |
1896 |
8 X 10 |
|
00142 |
NCD |
Starting Stone Wall - Houses In Background |
1896 |
8 X 10 |
|
00143 |
NCD |
Main Dam Excavation |
1896 |
8 X 10 |
|
00144 |
NCD |
Excavation For Main Foundation |
1896 |
8 X 10 |
|
00145 |
NCD |
Excavation Foundation |
1896 |
8 X 10 |
|
00146 |
NCD |
Main Dam Deep Rock Cut |
1896 |
7 1/4 X 9 1/2 |
|
00147 |
NCD |
Men Standing In Excavation Of Foundation |
1896 |
8 X 10 |
|
00148 |
NCD |
Men In Excavation Of Foundation |
1896 |
8 X 10 |
|
00149 |
NCD |
Laying Of First Stone In Deep Rock |
1896 |
8 X 10 |
|
00150 |
NCD |
Main Excavation |
1896 |
8 X 10 |
|
00151 |
NCD |
Steam Shovel Working In Foundation |
1896 |
8 X 10 |
|
00152 |
NCD |
Foundation |
1896 |
8 X 10 |
|
00153 |
NCD |
Working On Main Foundation |
1896 |
8 X 10 |
|
00154 |
NCD |
Steam Shovel Working |
1896 |
8 X 10 |
|
00155 |
NCD |
Foundation Excavation |
1896 |
8 X 10 |
|
00156 |
NCD |
Main Dam Excavation Looking East |
1896 |
8 X 10 |
|
00157 |
NCD |
Man In Hole - Steam Pipe Venting Steam |
1896 |
8 X 10 |
|
00158 |
NCD |
Rubble Masonry Blocks |
1896 |
8 X 10 |
|
00159 |
NCD |
Working In Foundation |
1896 |
8 X 10 |
|
00160 |
NCD |
Working In Main Foundation |
1896 |
8 X 10 |
|
00161 |
NCD |
Drainage Pipe From New Foundation |
1896 |
8 X 10 |
|
00162 |
NCD |
Steam Pipe in Foundation |
1896 |
8 X 10 |
|
00163 |
NCD |
Working In Excavating Foundation |
1896 |
8 X 10 |
|
00164 |
NCD |
Men Working In Excavation |
1896 |
8 X 10 |
|
00165 |
NCD |
Building Foundation |
1896 |
8 X 10 |
|
00166 |
NCD |
Men Working On Foundation |
1896 |
8 X 10 |
|
00167 |
NCD |
Excavation Stiff Legged Derrick With Men |
1896 |
7 X 9 |
|
00168 |
NCD |
Stiff Legged Derrick And Granite Blocks |
1891 |
9 1/2 X 8 |
|
00169 |
NCD |
Excavation For Dam Foundation |
1892 |
5 X 7 |
|
00170 |
NCD |
Millwork To Divert Croton River |
1892 |
4 X 6 |
|
00171 |
NCD |
Palmer's Hotel With Men Standing Outside |
1892 |
6 X 11 |
|
00172 |
NCD |
Flume in Quarry |
1890 |
9 1/2 X 7 1/2 |
|
00173 |
NCD |
Catwalk over Diverting Trench |
1890 |
7 X 9 |
|
00174 |
NCD |
Newspaper Picture Of The Bowery. (6 Men) |
1888 |
4 X 6 |
|
00175 |
NCD |
Stiff Legged Derricks Lifting Granite In Quarry |
1893 |
9 1/2 X 8 |
|
00176 |
NCD |
Steam Shovel & Train |
1893 |
8 X 10 |
|
00177 |
NCD |
Building Diverting Trench |
1893 |
8 X 10 |
|
00178 |
NCD |
Coleman Contractor Looking Easterly Up Stream |
1893 |
9 X 7 1/2 |
|
00179 |
NCD |
J.S. Coleman, Contractor Looking Southeast By Rock Dump |
1893 |
9 1/2 X 7 1/2 |
|
00180 |
NCD |
Laying Out Granite With Railroad Tracks Around Dam Site |
1893 |
9 1/2 X 7 1/2 |
|
00181 |
NCD |
Temporary Canal For Diverting The Croton River |
1894 |
8 X 10 |
|
00182 |
NCD |
View Looking South Taken From North Side - J.S. Coleman |
1894 |
9 1/2 X 7 1/2 |
|
00183 |
NCD |
Looking Northeast Taken From The South Side |
1894 |
8 X 10 |
|
00184 |
NCD |
J.S. Coleman, Contractor, Looking North from So. of Temp. Channel |
1894 |
8 X 10 |
|
00185 |
NCD |
Excavating For Spillway |
1894 |
8 X 10 |
|
00186 |
NCD |
False Work |
1894 |
8 X 10 |
|
00187 |
NCD |
Picture Of Temporary Channel |
1894 |
8 X 10 |
|
00188 |
NCD |
Rubble In Hole. Railroad Tracks In Foreground |
1894 |
8 X 10 |
|
00189 |
NCD |
The New Croton Dam And The Reservoir-Article |
1894 |
8 X 10 |
|
00190 |
NCD |
Lithograph Of Construction |
1894 |
8 X 10 |
|
00191 |
NCD |
Steam Plants In Background |
1900 |
8 X 10 |
|
00192 |
NCD |
Cross - Section Of River Wall Looking West |
1900 |
8 X 10 |
|
00193 |
NCD |
Cross Section Of River Wall Showing Masonry |
1900 |
8 X 10 |
|
00194 |
NCD |
Flood - Lower Wing Dam |
1900 |
8 X 10 |
|
00195 |
NCD |
Flood-3/2/1900-10 am |
1900 |
8 X 10 |
|
00196 |
NCD |
Overview of River, Trench,Foundation |
1900 |
8 X 10 |
|
00197 |
NCD |
Dam From End of Bridge, Looking S.W. |
1900 |
8 X 10 |
|
00198 |
NCD |
Spillway Guard Vault And Chamber |
1900 |
8 X 10 |
|
00199 |
NCD |
Overview Of Construction Of Dam |
1900 |
8 X 10 |
|
00200 |
NCD |
Engineers Going Back To Ossining, NY |
1900 |
8 X 10 |
|
00201 |
NCD |
Final Rock On Spillway Surface |
1900 |
8 X 10 |
|
00202 |
NCD |
Final Rock Surface |
1900 |
8 X 10 |
|
00203 |
NCD |
Spillway |
1900 |
8 X 10 |
|
00204 |
NCD |
Upside Of Stream Looking Southwest |
1900 |
8 X 10 |
|
00205 |
NCD |
Down - Stream Side Of Dam |
1900 |
8 X 10 |
|
00206 |
NCD |
Foundation-Rock |
1900 |
8 X 10 |
|
00207 |
NCD |
Men In Rock Foundation |
1900 |
8 X 10 |
|
00208 |
NCD |
Workers in Front of Dam Wall |
1900 |
8 X 10 |
|
00209 |
NCD |
W. View of Adm. House-False Work |
1900 |
8 X 10 |
|
00210 |
NCD |
Spillway |
1900 |
8 X 10 |
|
00211 |
NCD |
Numbered Blocks Going to Spillway-Capping Stones |
1900 |
8 X 10 |
|
00212 |
NCD |
Stone Rises |
1900 |
8 X 10 |
|
00213 |
NCD |
Showing Upstream Side Looking South |
1900 |
8 X 10 |
|
00214 |
NCD |
Overview Of The New Croton Dam |
1900 |
8 X 10 |
|
00215 |
NCD |
Overview Of Dam Construction Up Stream Side |
1900 |
8 X 10 |
|
00216 |
NCD |
View Looking At Wing Wall From The East |
1900 |
8 X 10 |
|
00217 |
NCD |
Overview Of Dam Site |
1900 |
8 X 10 |
|
00218 |
NCD |
Top View Of The New Croton Dam Site-Up Stream Side |
1900 |
8 X 10 |
|
00219 |
NCD |
Overview Of Construction Looking At Wing Wall |
1900 |
8 X 10 |
|
00220 |
NCD |
Workers Laying Blocks |
1900 |
8 X 10 |
|
00221 |
NCD |
West Side Of Spillway |
1900 |
8 X 10 |
|
00222 |
NCD |
New Croton Dam Overview |
1900 |
8 X 10 |
|
00223 |
NCD |
Spillway-Blocks |
1901 |
8 X 10 |
|
00224 |
NCD |
Picture Of A Box Structure |
1900 |
3 1/2 X 2 1/2 |
|
00225 |
NCD |
Tents - Militia At Dam |
1900 |
5 X 3 |
|
00226 |
NCD |
Overview Of Walls Rising |
1900 |
8 X 10 |
|
00227 |
NCD |
Rail Line With Side Dumper Gondolas In Excavation |
1900 |
8 X 10 |
|
00228 |
NCD |
Bridge Leading To Bowery |
1900 |
7 X 5 |
|
00229 |
NCD |
Machines Working On The New Croton Dam Site |
1900 |
8 X 10 |
|
00230 |
NCD |
Showing High Water |
1900 |
8 X 10 |
|
00231 |
NCD |
Tents Of Militia At Dam |
1900 |
5 X 3 |
|
00232 |
NCD |
Overview Of The New Croton Dam Site Tracks and Trench |
1900 |
5 X 3 |
|
00233 |
NCD |
Aftermath Of Flood |
1900 |
8 X 10 |
|
00234 |
NCD |
Steam Powered Trains Being Pulled By Horses To Dam Site |
1900 |
8 X 10 |
|
00235 |
NCD |
Overview From Hill Back Of Cable Towers |
1900 |
11 X 4 |
|
00236 |
NCD |
Swing Bridge Over Croton River |
1900 |
8 X 6 |
|
00237 |
NCD |
Overview Of Dam Construction |
1900 |
8 X 10 |
|
00238 |
NCD |
Railroad Going Down Into Foundation |
1898 |
8 X 10 |
|
00239 |
NCD |
Overview Of Almost - Finished Croton Dam |
1904 |
8 X 10 |
|
00240 |
NCD |
Back Side Of The New Croton Dam |
1901 |
8 X 10 |
|
00241 |
NCD |
Overview Of Almost - Completed Croton Dam |
1901 |
5 X 7 |
|
00242 |
NCD |
Swing Bridge Across Croton River |
1901 |
5 X 7 |
|
00243 |
NCD |
The New Croton Dam,Viewed From A Distance |
1901 |
8 X 10 |
|
00244 |
NCD |
10 ft Arch |
1901 |
5 X 7 |
|
00245 |
NCD |
Overview - Swing Bridge In Foreground |
1901 |
8 X 10 |
|
00246 |
NCD |
Overview Of New Croton Dam -Spillway In Foreground |
1901 |
8 X 10 |
|
00247 |
NCD |
Venting Steam From Construction At The Croton |
1901 |
8 X 10 |
|
00248 |
NCD |
Numbered Granite Waiting To Be Placed |
1901 |
8 X 10 |
|
00249 |
NCD |
Back Of Structure |
1901 |
8 X 10 |
|
00250 |
NCD |
Overall View Of Structure |
1901 |
8 X 10 |
|
00251 |
NCD |
Numbered Granite Waiting To Be Placed |
1901 |
8 X 10 |
|
00252 |
NCD |
Water Behind Wall |
1901 |
8 X 10 |
|
00253 |
NCD |
Water Flowing Through Open Vent |
1901 |
8 X 10 |
|
00254 |
NCD |
View Of Wall With Side Dumper Car At Bottom |
1901 |
8 X 10 |
|
00255 |
NCD |
Croton Hills And Dam |
1901 |
8 X 10 |
|
00256 |
NCD |
Overview Of New Croton Dam Site And Derricks With Steam |
1901 |
8 X 10 |
|
00257 |
NCD |
Dam Progressing |
1901 |
8 X 10 |
|
00258 |
NCD |
Overview Of Wing Wall |
1901 |
8 X 10 |
|
00259 |
NCD |
Complete - View Swing Bridge In Foreground |
1901 |
8 X 10 |
|
00260 |
NCD |
Overview |
1901 |
8 X 10 |
|
00261 |
NCD |
Almost Complete Section |
1901 |
8 X 10 |
|
00262 |
NCD |
Tall Granite Tower |
1901 |
8 X 10 |
|
00263 |
NCD |
Looking At Spillway From Above |
1901 |
8 X 10 |
|
00264 |
NCD |
Spillway |
1901 |
8 X 10 |
|
00265 |
NCD |
False Work And Steel Arch. -Spillway Progressing |
1901 |
8 X 10 |
|
00266 |
NCD |
3 Men Standing On Road |
1901 |
8 X 10 |
|
00267 |
NCD |
Core Wall |
1901 |
8 X 10 |
|
00268 |
NCD |
Spillway Progressing |
1901 |
8 X 10 |
|
00269 |
NCD |
Overview - Spillway Of Dam Site |
1901 |
5 X 7 |
|
00270 |
NCD |
Overview Looking East Of The New Croton Dam |
1901 |
5 X 7 |
|
00271 |
NCD |
Spillway - Croton River In Foreground |
1901 |
8 X 10 |
|
00272 |
NCD |
View Of Spillway And Railroad Tracks Used For Supplies |
1901 |
8 X 10 |
|
00273 |
NCD |
Flood |
1901 |
8 X 10 |
|
00274 |
NCD |
Face Of Dam And Croton River Overview |
1901 |
8 X 10 |
|
00275 |
NCD |
Side View Across Top Of The Dam Showing Progression |
1901 |
8 X 10 |
|
00276 |
NCD |
Cap Stones |
1901 |
8 X 10 |
|
00277 |
NCD |
Top View Of Dam Site |
1901 |
8 X 10 |
|
00278 |
NCD |
Frontal View Of Entire Structure |
1901 |
8 X 10 |
|
00279 |
NCD |
Overview Of Spillway |
1901 |
8 X 10 |
|
00280 |
NCD |
Group Of Men |
1901 |
8 X 10 |
|
00281 |
NCD |
View Of The Bowery |
1901 |
5 X 7 |
|
00282 |
NCD |
Progression Of Spillway Construction |
1901 |
8 X 10 |
|
00283 |
NCD |
Overview Of Complete Structure |
1901 |
8 X 10 |
|
00284 |
NCD |
Front Of Structure |
1902 |
3 1/2 X 5 |
|
00285 |
NCD |
Spillway Swing Bridge In Foreground |
1901 |
8 X 10 |
|
00286 |
NCD |
Front Of Dam Showing Piles Of Granite Awaiting Placement |
1901 |
8 X 10 |
|
00287 |
NCD |
Croton River |
1902 |
8 X 10 |
|
00288 |
NCD |
Swing Bridge |
1902 |
4 X 5 |
|
00289 |
NCD |
The Dam |
1902 |
4 X 5 |
|
00290 |
NCD |
View Of Spillway - Larkintown Partially Shown In Distance |
1902 |
8 X 10 |
|
00291 |
NCD |
View Of Spillway - Larkintown |
1902 |
8 X 10 |
|
00292 |
NCD |
Front View Of Spillway |
1902 |
8 X 10 |
|
00293 |
NCD |
Larkintown On Hill - Spillway In Foreground |
1902 |
8 X 10 |
|
00294 |
NCD |
Spillway - Larkintown Beyond The Hills |
1902 |
8 X 10 |
|
00295 |
NCD |
Close Up Of Spillway In Foreground |
1902 |
8 X 10 |
|
00296 |
NCD |
Side Of Spillway Reservoir Partially Filled Behind |
1902 |
8 X 10 |
|
00297 |
NCD |
Back Wall Of Structure Showing Steam Derricks |
1902 |
8 X 10 |
|
00298 |
NCD |
Close - Up Of Spillway |
1902 |
8 X 10 |
|
00299 |
NCD |
View Of Piles Of Granite Awaiting To Be Placed In Position |
1902 |
8 X 10 |
|
00300 |
NCD |
Quarry In Background |
1902 |
8 X 10 |
|
00301 |
NCD |
Builders And Engineers Having Photo Taken |
1902 |
8 X 10 |
|
00302 |
NCD |
Man Standing In Front Of Blocks Of Granite Shows Comparision In Size |
1902 |
8 X 10 |
|
00303 |
NCD |
Front View With Granite Piles Awaiting Their Placement |
1902 |
5 X 7 |
|
00304 |
NCD |
Winter Scene, Upstream Side |
1902 |
8 X 10 |
|
00305 |
NCD |
Front Of Structure - Railroad Tracks On Side |
1902 |
8 X 10 |
|
00306 |
NCD |
Front Of Dam - Man On Swing Bridge |
1902 |
8 X 10 |
|
00307 |
NCD |
Possibly Cornell's House On Hill - Over-Seeing Construction |
1902 |
8 X 10 |
|
00308 |
NCD |
View From Side Of Valley |
1902 |
8 X 10 |
|
00309 |
NCD |
Swing Bridge Above Flooded Diverting Ditch |
1902 |
8 X 10 |
|
00310 |
NCD |
Part Of The Spillway |
1902 |
8 X 10 |
|
00311 |
NCD |
Front View Of Structure, - Swing Bridge With Man On It In Foreground |
1902 |
8 X 10 |
|
00312 |
NCD |
Piles Of Granite In Front Of Structure |
1902 |
8 X 10 |
|
00313 |
NCD |
Dam Construction |
1902 |
8 X 10 |
|
00314 |
NCD |
Dam Construction |
1902 |
8 X 10 |
|
00315 |
NCD |
Modern Picture of Spillway |
1939 |
3 X 3 |
|
00316 |
NCD |
Repairs To Spillway - Good Picture |
1955 |
8 X 10 |
|
00317 |
NCD |
Over - Flow After Storm |
1955 |
11 X 9 |
|
00318 |
NCD |
Safe And Gun Retrieved From Reservoir |
1940 |
3 X 3 |
|
00319 |
NCD |
Low Water To Repair Crack In Dam |
1950 |
3 X 3 |
|
00320 |
NCD |
Finished Dam-West Side |
2000 |
5 X 7 |
|
00321 |
NCD |
Cars Over top Of Dam |
2000 |
5 X 7 |
|
00322 |
NCD |
Croton River |
2000 |
5 X 7 |
|
00323 |
NCD |
Shore Of The Croton River |
2000 |
5 X 7 |
|
00324 |
NCD |
Overflow Of Water |
2000 |
5 X 7 |
|
00325 |
NCD |
Water On Rocks Near Dam |
5 X 7 |
||
00326 |
NCD |
Croton River |
5 X 7 |
||
00327 |
NCD |
Fountain At Dam |
2000 |
5 X 7 |
|
00328 |
NCD |
Original Fountain At Dam |
1915 |
5 X 7 |
|
00329 |
NCD |
Demolition Of Steel Arch Bridge Over Spillway |
1974 |
5 X 7 |
|
00330 |
NCD |
Road Leading Up To The Dam |
5 X 7 |
||
00331 |
NCD |
The Very Top Of The Spillway |
1950's |
5 X 7 |
|
00332 |
NCD |
Scattered Granite Rocks |
1960's |
5 X 7 |
|
00333 |
NCD |
Picture Of Side Spillway - Level Of Stone Removed |
1953 |
8 X 10 |
|
00334 |
NCD |
People Looking At Overflow At The Dam |
1955 |
8 X 10 |
|
00335 |
NCD |
Julianna Hand Advertisement |
1976 |
7 X 5 |
|
00336 |
NCD |
Completed Dam And Iron Bridge |
1920 |
6 1/2 X 4 |
|
00337 |
NCD |
Showing Release Of The Side Vents |
1975 |
7 X 6 |
|
00338 |
NCD |
Picture Of Spillway And Iron Bridges And Croton River |
1956 |
10 X 6 1/2 |
|
00339 |
NCD |
Face Lifting Of Dam |
1974 |
4 X 3 |
|
00340 |
NCD |
Aerial View of Dam and Reservoir |
1995 |
4 X 6 |
|
00341 |
NCD |
Aerial View of System |
1995 |
4 X 6 |
|
00342 |
NCD |
Overview Of Entire Structure |
5 X 7 |
||
00343 |
NCD |
Spillway |
1930 |
6 1/2 X 4 1/2 |
|
00344 |
NCD |
Winter View |
1950 |
5 X 7 |
|
00345 |
NCD |
Spillway |
1950 |
6 X 8 |
|
00346 |
NCD |
Original Spillway |
1940's |
6 X 4 |
|
00347 |
NCD |
View Of Dam |
1930 |
11 X 9 |
|
00348 |
NCD |
Repairs To Dam |
8 X 10 |
||
00349 |
NCD |
Helicopter Over Dam |
4 1/2 X 7 |
||
00350 |
NCD |
Aerial View - Over - Croton River And Bridge and Park |
8 X 10 |
||
00351 |
NCD |
Newspaper Print Of Dam and Park |
1910 |
8 X 10 |
|
00352 |
NCD |
Reconstruction Of New Steel Arch |
1974 |
6 X 4 1/2 |
|
00353 |
NCD |
View Shows Lowering Water Level For Repairs |
1955 |
8 X 10 |
|
00354 |
NCD |
View Showing Inside Top Of Dam |
1902 |
8 X 10 |
|
00355 |
NCD |
View Showing Drop In Water For Repairs |
1955 |
8 X 10 |
|
00356 |
NCD |
Spillway-Bridge no Arches |
1955 |
8 X 10 |
|
00357 |
NCD |
Newspaper Showing Measurements |
1908 |
5 X 7 |
|
00358 |
NCD |
Winter View Of The Spillway |
1920 |
6 X 4 |
|
00359 |
NCD |
Overview - Part Of Steam Plant Still Standing |
1910 |
5 X 7 |
|
00360 |
NCD |
Close Up Of Spillway |
1920 |
8 X 10 |
|
00361 |
NCD |
View Of Spillway |
1920 |
10 X 6 |
|
00362 |
NCD |
View From Side Road On Hill |
1920 |
5 X 7 |
|
00363 |
NCD |
Frontal View Of Spillway |
1922 |
5 X 7 |
|
00364 |
NCD |
Side Spillway Overflow |
1922 |
5 X 7 |
|
00365 |
NCD |
Dam Overflow |
1920 |
8 X 10 |
|
00366 |
NCD |
Side View Of Entire Structure |
1920 |
8 X 10 |
|
00367 |
NCD |
Woman Looking at Spillway |
1920 |
8 X 10 |
|
00368 |
NCD |
Picture Of Completed Dam |
1908 |
5 X 7 |
|
00369 |
NCD |
Spillway |
1990 |
8 X 10 |
|
00370 |
NCD |
Color View Of Spillway From Hills |
1990 |
8 X 10 |
|
00371 |
NCD |
Fountain In Front Of Dam Showing Three Spouts |
1910 |
9 1/2 X 6 |
|
00372 |
NCD |
Snap Shot Overview |
1920 |
3 X 5 |
|
00373 |
NCD |
Frontal View Of Spillway |
1920 |
5 X 7 |
|
00374 |
NCD |
Frontal View Of Spillway |
1999 |
8 X 10 |
|
00375 |
NCD |
Frontal View OF Span And Spillway |
1920 |
5 X 7 |
|
00376 |
NCD |
Overview - Bridge To Park |
1990 |
8 X 6 |
|
00377 |
NCD |
Side View Of Structure And Spillway |
1920 |
5 X 7 |
|
00378 |
NCD |
Repairing Dam |
1991 |
8 X 10 |
|
00379 |
ACQ |
Rebuilding Of A New Pump House By Old Croton Dam |
1987 |
4 X 5 |
|
00380 |
ACQ |
Old Croton Dam-Rowers |
1800 |
11 X 6 |
|
00381 |
NCD |
Drought Exposing Farm Foundations |
1956 |
5 X 6 |
|
00382 |
NCR |
Reservoir During Drought |
1956 |
5 X 6 |
|
00383 |
NCR |
Reservoir During Drought |
1956 |
5 X 6 |
|
00384 |
NCR |
Old Croton Dam During Drought |
1956 |
5 X 6 |
|
00385 |
OCD |
Drought |
1956 |
4 X 6 |
|
00386 |
NCD |
Croton Lake Drought |
1949 |
5 X 6 |
|
00387 |
OCD |
Pump House Showing Drought |
1949 |
5 X 7 |
|
00388 |
OCD |
Drought |
1956 |
4 X 5 |
|
00389 |
NCR |
Croton Lakes Drought |
1956 |
8 X 10 |
|
00390 |
NCD |
Drought |
1949 |
4 X 6 |
|
00391 |
NCD |
Reconstruction Of Arch |
2004 |
8 X 10 |
|
00392 |
NCD |
Flooding |
1900 |
8 X 10 |
|
00393 |
NCD |
Flood From Dump On South Side Of River |
1900 |
8 X 10 |
|
00394 |
NCD |
Flood From Upper Suspension Bridge |
1900 |
8 X 10 |
|
00395 |
NCD |
Flood From Upper Suspension Bridge |
1900 |
8 X 10 |
|
00396 |
NCD |
Flood |
1900 |
8 X 10 |
|
00397 |
NCD |
Flooding |
1900 |
8 X 10 |
|
00398 |
NCD |
Flooding |
1900 |
8 X 10 |
|
00399 |
NCD |
Flooding |
1900 |
8 X 10 |
|
00400 |
NCD |
Flooding Breaking Of Lower Original Dam |
1900 |
8 X 10 |
|
00401 |
NCD |
Over Turned Wagon |
1900 |
8 X 10 |
|
00402 |
NCD |
Releasing Water from Vent |
1902 |
8 X 10 |
|
00403 |
NCD |
Appears To Be A Flooded Area Of Lower Dam |
1900 |
8 X 10 |
|
00404 |
NCD |
Appears To Be Flooding Area -Swing Bridge |
1900 |
8 X 10 |
|
00405 |
NCD |
Showing Flooded Area |
1900 |
8 X 10 |
|
00406 |
NCD |
A Flooded Area-Trench |
1900 |
8 X 10 |
|
00407 |
NCD |
Flooding |
1900 |
8 X 10 |
|
00408 |
NCD |
Flood From Dump On South Side Of River |
1900 |
8 X 10 |
|
00409 |
NCD |
Flood Of 1950 |
1950 |
3 X 3 |
|
00410 |
NCD |
Flood Of 1958 |
1958 |
8 X 10 |
|
00411 |
NCD |
Flood of 1955 |
1955 |
5 X 7 |
|
00412 |
NCD |
Flooding From Hurricane Floyd |
1999 |
4 X 6 |
|
00413 |
NCD |
Sketch Of Spillway |
1900 |
8 X 10 |
|
00414 |
NCD |
Sketch Of Militia Tents Strike |
1900 |
7 X 6 |
|
00415 |
NCD |
Sketch Of Militia Strike |
1900 |
7 X 6 |
|
00416 |
NCD |
Painting Of Dam - Calendar |
1950 |
7 X 6 |
|
00417 |
NCD |
Painting Of Dam-D'Alvia |
8 X 10 |
||
00418 |
NCD |
Newspaper - Strike At Croton Dam |
1900 |
8 X 10 |
|
00419 |
NCD |
Lithograph Of Construction |
1894 |
8 X 10 |
|
00420 |
NCD |
Strike At The Dam |
1900 |
8 X 6 |
|
00421 |
NCD |
Reconstruction Of Arch and Bridge |
2004 |
8 1/2 X 6 |
|
00422 |
NCD |
Front View Of Dam - Post Card |
1950 |
10 X 6 |
|
00423 |
NCD |
Overflow At The Croton Dam |
1969 |
11 X 8 |
|
00424 |
NCD |
Newspaper Article New Croton Dam |
1923 |
||
00425 |
NCD |
Encampment Of Regiment / Children Playing On The Hill |
1900 |
8 X 10 |
|
00426 |
NCD |
Encampment Of Militia On Hill / Houses Still Left |
1900 |
8 X 10 |
|
00427 |
NCD |
Part Of Regiment Encampment |
1900 |
8 X 10 |
|
00428 |
NCD |
Militia Encampment In Field |
1900 |
8 X 10 |
|
00429 |
NCD |
False Work-Pver Stream |
1895 |
8 X 10 |
|
00430 |
NCD |
Partially Completed Structure |
1905 |
17 X 20 |
|
00431 |
NCD |
Partially Completed Spillway |
1904 |
17 X 20 |
|
00432 |
OCD |
Showing Old And New Gatehouse |
1904 |
8 X 10 |
|
00433 |
NCD |
Reservoir Filled - Spillway Almost Completed |
1905 |
12 X 20 |
|
00434 |
NCD |
Filling Up Reservoir - Partially Completed Structure |
1905 |
17 X 20 |
|
00435 |
NCD |
Working On Roadway - Top Of Dam |
1905 |
12 X 17 |
|
00436 |
NCD |
Bridge To Pump House |
1905 |
8 X 10 |
|
00437 |
NCD |
Cornell House In Front Of Spillway |
1905 |
8 X 10 |
|
00438 |
NCD |
Side View Of Release Vent Spouting Water |
1905 |
8 X 10 |
|
00439 |
NCD |
Appears To Be A Release Of Water From Vents |
1905 |
8 X 10 |
|
00440 |
NCD |
New Croton Dam Is Filled |
1905 |
5 X 7 |
|
00441 |
NCD |
Overview Of Diverting Ditch |
1903 |
8 X 10 |
|
00442 |
NCD |
Newspaper Clipping |
1905 |
8 X 10 |
|
00443 |
NCD |
Steam Plant Still Standing Land-scaping Hill |
1905 |
8 X 10 |
|
00444 |
NCD |
Newspaper View Of Spillway Looking Down Valley |
8 X 10 |
||
00445 |
NCD |
Starting To Fill Wall |
1905 |
8 X 10 |
|
00446 |
OCD |
Derick on Steel Bridge |
1904 |
8 X 10 |
|
00447 |
NCD |
Derricks |
1904 |
8 X 10 |
|
00448 |
NCD |
Steam Engine and Cranes |
1904 |
8 X 6 |
|
00449 |
NCD |
Working On Super Structure Railroad Tracks In Front |
1904 |
8 X 10 |
|
00450 |
NCD |
Front Structure - Houses On Hills |
1904 |
8 X 10 |
|
00451 |
NCD |
Vent |
1904 |
8 X 10 |
|
00452 |
NCD |
Front Of Structure |
1904 |
8 X 10 |
|
00453 |
NCD |
Piles Of Granite - Swing Bridge |
1904 |
8 X 10 |
|
00454 |
OCD |
Old Croton Dam Building Super -Structure With Railroad Tracks |
1904 |
8 X 10 |
|
00455 |
NCD |
Spillway |
8 X 10 |
||
00456 |
NCD |
Moving House Out Of Harm's Way - Clothes On Line |
1904 |
8 X 10 |
|
00457 |
NCD |
Main Structure |
8 X 10 |
||
00458 |
NCD |
Wall Of Stone - Steam Plant |
1904 |
8 X 10 |
|
00459 |
NCD |
Test Borings On Lake For The New Croton Dam |
1975 |
4 X 6 |
|
00460 |
NCD |
Flood Or Venting Water - Front Structure - Railroad Tracks Washed Away |
1904 |
8 X 10 |
|
00461 |
OCD |
Gatehouse |
8 X 10 |
||
00462 |
NCD |
Shows Boarding House, Black Smith's Shop And Paymaster Quarters |
5 X 7 |
||
00463 |
NCD |
Steam Generator |
1904 |
8 X 10 |
|
00464 |
NCD |
Men Working On Masonry |
1904 |
8 X 10 |
|
00465 |
NCD |
Moving Blocks |
1904 |
8 X 10 |
|
00466 |
NCD |
Men Working In Hole |
1904 |
8 X 10 |
|
00467 |
NCD |
Piles Of Granite In Front Of Structure |
1904 |
8 X 10 |
|
00468 |
NCD |
View Of Spillway |
1904 |
8 X 10 |
|
00469 |
NCD |
Upstream wall |
1902 |
8 X 10 |
|
00470 |
NCD |
Main Structure Released Water From Vents |
8 X 10 |
||
00471 |
NCD |
Men Working With Pipes |
1904 |
8 X 10 |
|
00472 |
NCD |
Railroad Tracks In Front Of Structure |
1904 |
8 X 10 |
|
00473 |
NCD |
Derrick In Front Getting Ready To Hoist Block |
1904 |
8 X 10 |
|
00474 |
NCD |
Structure and Swing Bridge |
1904 |
8 X 10 |
|
00475 |
NCD |
Steam Plant |
1904 |
8 X 10 |
|
00476 |
NCD |
Quarry |
1904 |
8 X 10 |
|
00477 |
NCD |
Exposed Top Dam And Surrounding Area |
1904 |
8 1/2 X 7 |
|
00478 |
NCD |
Top Of Exposed Dam Showing Scaffolding How Men Set Stone |
1904 |
8 1/2 X 7 |
|
00479 |
NCD |
Overall View Of Top Width |
1903 |
5 X 7 |
|
00480 |
NCD |
Overall View Of Structure Steam Plant On Right Side |
1903 |
8 X 10 |
|
00481 |
NCD |
Rock Bottom Of Structure Men Standing |
1903 |
8 X 10 |
|
00482 |
NCD |
Showing False Work And Masons Setting Granite |
1903 |
8 X 10 |
|
00483 |
NCD |
Side Spillway |
1902 |
8 X 10 |
|
00484 |
NCD |
View Of The Bowery |
1908 |
5 X 7 |
|
00485 |
NCD |
Overview Of Construction Showing Steam Derricks |
1903 |
8 X 10 |
|
00486 |
NCD |
Panorama Of Front Of Structure |
1903 |
11 X 3 1/2 |
|
00487 |
NCD |
Overview Of Structure's Width |
1903 |
11 X 3 1/2 |
|
00488 |
NCD |
Overview - Larkintown In Hills, Bowery On Left, Structure In Background |
1903 |
11 X 3 1/2 |
|
00489 |
NCD |
Panorama Of Entire Site |
1903 |
11 X 3 1/2 |
|
00490 |
NCD |
Good View OF The Quarry |
1903 |
8 X 10 |
|
00491 |
NCD |
Working The Quarry |
8 X 10 |
||
00492 |
NCD |
Quarry |
1906 |
8 X 10 |
|
00493 |
NCD |
Blue Stone Quarry |
1898 |
8 X 10 |
|
00494 |
NCD |
Working The Quarry |
1903 |
8 X 10 |
|
00495 |
NCD |
Quarry Site |
1905 |
8 X 10 |
|
00496 |
NCD |
Granite Awaiting Transportation To Dam Site |
1900 |
8 X 10 |
|
00497 |
NCD |
Granite Piled By Railroad Tracks Awaiting Pick - Up To Structure |
1903 |
8 X 10 |
|
00498 |
NCD |
Quarry Site Before Excavating Started |
1893 |
8 X 10 |
|
00499 |
NCD |
Completed Spillway |
1906 |
5 X 10 |
|
00500 |
NCD |
Caboose Used With Railroad At Dam. Dignitaries Are Looking On |
1906 |
5 X 7 |
|
00501 |
NCD |
Completed East End Of Road Over Dam |
1906 |
8 X 10 |
|
00502 |
NCD |
Ceremony Setting Last Stone |
1906 |
8 X 10 |
|
00503 |
NCD |
Setting Last Stone |
1906 |
5 X 7 |
|
00504 |
NCD |
Setting Last Stone |
1906 |
8 X 10 |
|
00505 |
NCD |
New Capping Rim At Dam |
1906 |
5 X 7 |
|
00506 |
NCD |
Horse And Buggy Over Culvert New Croton Reservoir |
8 X 10 |
||
00507 |
NCD |
Spillway And Bridge Looking Down Valley |
1906 |
8 X 10 |
|
00508 |
NCD |
Overview Of Completed Dam 2 Men In Foreground |
1906 |
5 X 7 |
|
00509 |
NCD |
Completed Dam - Jack O'Neil Boarding House |
1906 |
5 X 7 |
|
00510 |
NCD |
Overview Of Complete Structure |
1906 |
5 X 7 |
|
00511 |
NCD |
Long Spillway Overflowing |
1907 |
5 X 7 |
|
00512 |
NCD |
Completed Spillway |
1908 |
11 X 15 |
|
00513 |
NCD |
Quarry |
1903 |
8 X 10 |
|
00514 |
NCD |
Quarry Men Working Quarry With Ropes And Derricks |
8 X 10 |
||
00515 |
NCD |
Wooden Structure By Railroad Tracks |
1904 |
8 X 10 |
|
00516 |
NCD |
Men Chipping Granite Blocks |
1903 |
8 X 10 |
|
00517 |
NCD |
Little Steam Engine At The Quarry |
5 X 7 |
||
00518 |
NCD |
Quarry Man Standing In Front Of Huge Slab |
1903 |
8 X 10 |
|
00519 |
NCD |
Stone Quarry |
1906 |
8 X 10 |
|
00520 |
NCD |
Quarry |
1903 |
8 X 10 |
|
00521 |
NCD |
Men Working The Quarry |
1903 |
8 X 10 |
|
00522 |
NCD |
Men Working The Quarry |
1903 |
8 X 10 |
|
00523 |
NCD |
Quarry Granite Piled By Railroad Tracks Awaiting Pick Up To Site Men Standing On Top |
1900 |
8 X 10 |
|
00524 |
NCD |
Quarry - Huge Boulder |
1900 |
5 X 7 |
|
00525 |
NCD |
Granite Quarry |
1904 |
8 X 10 |
|
00526 |
NCD |
Granite Blocks Being Sorted And Shaped |
1899 |
8 X 10 |
|
00527 |
NCD |
Quarry |
1904 |
8 X 10 |
|
00528 |
NCD |
Quarry - Cleaning Stone |
1903 |
8 X 10 |
|
00529 |
NCD |
Quarry - Loose Rubble,Showing Highway |
1907 |
17 X 20 |
|
00530 |
NCD |
Quarry Men Working |
8 X 10 |
||
00531 |
NCD |
Blue Stone Quarry - Loose Rubble |
1907 |
15 X 20 |
|
00532 |
NCD |
Blue Stone Quarry,Derrick and Workers |
1897 |
8 X 10 |
|
00533 |
NCD |
Portion of Rubble Quarry, Blue Stone |
1897 |
8 X 10 |
|
00534 |
NCD |
Quarry 7 Men 3 Stones |
1898 |
5 X 7 |
|
00535 |
NCD |
Men Posing For Camera |
1896 |
8 X 6 |
|
00536 |
NCD |
Men Looking At Camera Man |
1896 |
8 X 6 |
|
00537 |
NCD |
Contruction Engineers Old Dam |
1886 |
8 X 10 |
|
00538 |
NCD |
Engineers And Railroad Crew |
5 X 7 |
||
00539 |
NCD |
Mr. and Mrs. Goldsborough In Buggy - Steam Plant In Background |
1898 |
8 X 10 |
|
00540 |
NCD |
Workmen And Steam Derricks |
1900 |
8 X 10 |
|
00541 |
NCD |
Engineers And Contractors |
1903 |
8 X 10 |
|
00542 |
NCD |
Engineers And Contractors |
1905 |
8 X 10 |
|
00543 |
NCD |
Stone Masons Stopped Work For Photograph |
1898 |
8 X 10 |
|
00544 |
NCD |
Overview - Swing Bridge In Foreground |
1899 |
8 X 10 |
|
00545 |
NCD |
Overview From Top Of The Structure |
1907 |
4 X 2 |
|
00546 |
NCD |
Overall View Of Total Structure Fountain And Bridge |
1907 |
4 1/2 X 6 1/2 |
|
00547 |
NCD |
Spillway - Completed Structure |
1907 |
4 1/2 X 6 1/2 |
|
00548 |
NCD |
Road Over Dam |
1920's |
8 X 10 |
|
00549 |
NCD |
Overview OF Spillway Looking South At Croton River |
8 X 10 |
||
00550 |
NCD |
Picture Of Spillway |
8 X 10 |
||
00551 |
NCD |
Flood Overview Of Bowery And Railroad Tracks Croton River |
1900 |
8 X 10 |
|
00552 |
NCD |
Quarry |
1898 |
5 X 7 |
|
00553 |
NCD |
Overview Of Dam In Progress |
1899 |
8 X 10 |
|
00554 |
NCD |
Cables Over Diverted River |
1899 |
6 X 8 |
|
00555 |
NCD |
Work In Progress |
1899 |
8 X 10 |
|
00556 |
NCD |
Swing Bridge In Foreground |
1899 |
5 X 7 |
|
00557 |
NCD |
Dam Work In Progress |
1899 |
5 X 7 |
|
00558 |
NCD |
Rock Bottom Of Channel |
1899 |
8 X 10 |
|
00559 |
NCD |
Portion Of Wing Wall - Steam Derricks Working |
1899 |
8 X 10 |
|
00560 |
NCD |
Overview Of Steam Derricks Working |
1899 |
8 X 10 |
|
00561 |
NCD |
Overview - Dam In Progress |
1899 |
8 X 10 |
|
00562 |
NCD |
Overview Of Work On The Foundation Looking South East |
1897 |
8 X 10 |
|
00563 |
NCD |
Overview Of Construction |
1899 |
8 X 10 |
|
00564 |
NCD |
Foundation In Progress |
1899 |
8 X 10 |
|
00565 |
NCD |
Excavating Through Rock For Spillway |
1899 |
8 X 10 |
|
00566 |
NCD |
Water Rushing Out Of Vent |
1902 |
8 X 10 |
|
00567 |
NCD |
Overview OF Diverting Ditch |
1900 |
8 X 10 |
|
00568 |
NCD |
Rock Bottom Steam Derricks And Machinery in Foreground |
1900 |
8 X 10 |
|
00569 |
NCD |
Overview Of Croton River |
1900 |
8 X 10 |
|
00570 |
NCD |
Diverting Ditch - Swing Bridge In Background |
1900 |
8 X 10 |
|
00571 |
NCD |
Overview Of Entire Site |
1900 |
8 X 10 |
|
00572 |
NCD |
Quarry Stiff Legged Derricks Working |
8 X 10 |
||
00573 |
NCD |
Looking Down On Site |
1900 |
8 X 10 |
|
00574 |
NCD |
Overview Of Militia Tents - Hill By Cornell's House |
1900 |
8 X 10 |
|
00575 |
NCD |
Workmen At The Quarry |
1898 |
5 X 7 |
|
00576 |
NCD |
Workmen - Stone Masons |
1898 |
8 X 10 |
|
00577 |
NCD |
Workmen Standing Atop Flat Cars Loaded With Granite |
1898 |
8 X 10 |
|
00578 |
NCD |
Workmen With Granite |
1899 |
8 X 10 |
|
00579 |
NCD |
Workmen : Masons : Galleli, Pasquale And Boss Breen From Ossining In Front |
1898 |
8 X 10 |
|
00580 |
NCD |
Workmen At Quarry |
1898 |
6 X 8 |
|
00581 |
NCD |
Workmen : Stone Masons - Time Out For Picture |
1898 |
8 X 10 |
|
00582 |
NCD |
Workmen Cleaning Stone At Quarry |
1898 |
8 X 10 |
|
00583 |
NCD |
Workmen - Excavation Of The Core Wall |
1898 |
8 X 10 |
|
00584 |
NCD |
Workers Lined Up In Front Of Spillway |
1896 |
8 X 10 |
|
00585 |
NCD |
Engineers And Contractors |
8 X 10 |
||
00586 |
NCD |
Laborers Lined Up For Picture |
4 X 6 |
||
00587 |
NCD |
Engineers |
1875 |
8 X 10 |
|
00588 |
NCD |
Riggers : Ben Griff Center Hands In Pocket |
1896 |
8 X 10 |
|
00589 |
NCD |
Excavation With Machine |
1896 |
8 X 10 |
|
00590 |
NCD |
City Engineers Engineers Gowen |
1902 |
8 X 10 |
|
00591 |
NCD |
Men In Front Of Dam, Ben Griff |
8 X 10 |
||
00592 |
NCD |
Steam Plant Men Looking At Construction |
1905 |
3 X 3 |
|
00593 |
NCD |
View Showing Railroad Tracks Going Around Structure |
1899 |
8 X 10 |
|
00594 |
NCD |
Transverse Section Showing Face Of A 15 Foot Bench Station 6 |
1898 |
6 X 8 |
|
00595 |
NCD |
Men Working In Quarry |
1898 |
6 X 8 |
|
00596 |
NCD |
Main Masonry Site Looking South |
1898 |
8 X 10 |
|
00597 |
NCD |
Overview Of Construction Site Swing Bridge In Foreground |
1898 |
8 X 10 |
|
00598 |
NCD |
Cable Tower # 1 |
1898 |
8 X 10 |
|
00599 |
NCD |
Workmen In Sand Pits |
1898 |
6 X 8 |
|
00600 |
NCD |
Masonry Core Wall Elevation |
1898 |
6 X 8 |
|
00601 |
NCD |
False Work For A Bridge |
1898 |
8 X 10 |
|
00602 |
NCD |
Workmen And Derricks Working Blocks Of Granite |
1898 |
6 X 8 |
|
00603 |
NCD |
Foundation Hole |
1898 |
8 X 10 |
|
00604 |
NCD |
Derricks Working Foundation -Railroad Tracks Going Around Site |
1898 |
8 X 10 |
|
00605 |
NCD |
Section Of Wing Wall - Side To Side |
1898 |
8 X 10 |
|
00606 |
NCD |
Foundation Work In Progress |
1898 |
8 X 10 |
|
00607 |
NCD |
Face Of Masonry |
1898 |
8 X 10 |
|
00608 |
NCD |
Working On Spillway |
1898 |
8 X 10 |
|
00609 |
NCD |
Blue Copy Of Cable Towers |
1898 |
6 X 8 |
|
00610 |
NCD |
View Taken To Show Amount Of Water Flowing Through Temporary Channel |
1898 |
8 X 10 |
|
00611 |
NCD |
View Looking Up-Streem, Croton River |
1898 |
8 X 10 |
|
00612 |
NCD |
Down - Stream Wall Face |
1898 |
6 X 8 |
|
00613 |
NCD |
Foundation In Progress |
1898 |
8 X 10 |
|
00614 |
NCD |
Main Masonry Dam Looking North East |
1898 |
8 X 10 |
|
00615 |
NCD |
Traverse Rock At Right Angles |
1898 |
8 X 10 |
|
00616 |
NCD |
Overview From Spur Road |
1898 |
8 X 10 |
|
00617 |
NCD |
Working With Electric Light |
1898 |
6 X 8 |
|
00618 |
NCD |
View Showing Water Flowing Through Temporary Channel |
1898 |
8 X 10 |
|
00619 |
NCD |
Rock Bottom Core Wall Trench Looking South |
1898 |
8 X 10 |
|
00620 |
NCD |
Part Of Dam Completed |
1904 |
4 X 6 |
|
00621 |
NCD |
Caboose With Dignitaries |
1906 |
4 X 8 |
|
00622 |
NCD |
Overview From Spur Road |
1898 |
8 X 10 |
|
00623 |
NCD |
Re-pointing Masonry With Portland Cement Mortar |
1898 |
6 X 8 |
|
00624 |
NCD |
Face Of Masonay Dam Between Station 4 & 5 |
1898 |
6 X 8 |
|
00625 |
NCD |
Men Pointing Stone |
1898 |
8 X 10 |
|
00626 |
NCD |
Quarry Train on Main Line Rounding the Dug-Way |
1898 |
5 X 7 |
|
00627 |
NCD |
Masonay Wall Showing Pointing At Time Of Setting Of Stones |
1898 |
8 X 10 |
|
00628 |
NCD |
View Between Stations 8 And 9 |
1898 |
8 X 10 |
|
00629 |
NCD |
Station 5 And 60 To 6 |
1898 |
8 X 10 |
|
00630 |
NCD |
Cable Engine House And Core Wall |
1898 |
8 X 7 |
|
00631 |
NCD |
Overview Of Construction From Spur Road |
1899 |
8 X 7 |
|
00632 |
NCD |
Beginning Of Construction - Railroad In Evidence |
1899 |
8 1/2 X 6 1/2 |
|
00633 |
NCD |
Steam Derrick, Working Main Dam Site |
1897 |
8 X 10 |
|
00634 |
NCD |
Slope And Berm At South End Of Main Dam Site |
1897 |
8 X 10 |
|
00635 |
NCD |
Rock Slide At Quarry |
1897 |
8 X 10 |
|
00636 |
NCD |
Junction Of Core Wall - With Wing Wall In Background |
1897 |
8 X 10 |
|
00637 |
NCD |
Quarry Steam Pipes Running |
1897 |
8 X 10 |
|
00638 |
NCD |
Winter Snow - Steam Derricks Working Main Dam Site |
1897 |
8 X 10 |
|
00639 |
NCD |
Canney's Horses Bringing Engine To Dam Site |
8 X 10 |
||
00640 |
NCD |
Steam Shovel At Cut Looking South East |
1897 |
8 X 10 |
|
00641 |
NCD |
Steam Shovel & Crew Working in Borrow Pit |
1989 |
8 X 10 |
|
00642 |
NCD |
Sorting Rubble For Foundation |
1897 |
8 X 10 |
|
00643 |
NCD |
View Of Steam Pipes, Generator |
1897 |
8 X 10 |
|
00644 |
NCD |
Steam Shovel And Men Working In The Quarry |
1897 |
8 X 10 |
|
00645 |
NCD |
Truck And Men Working Main Dam Site |
1897 |
8 X 10 |
|
00646 |
NCD |
Stepping At Bottom Of Core Wall |
1807 |
8 X 10 |
|
00647 |
NCD |
Steam Shovel Working While Horse Waits For Rider |
1897 |
8 X 10 |
|
00648 |
NCD |
Timber Coffer Dam |
1897 |
8 X 10 |
|
00649 |
NCD |
Steam Shovel In Foundation |
1897 |
8 X 10 |
|
00650 |
NCD |
Men Posing For Picture - Under False Work For Coffer Dam |
1897 |
8 X 10 |
|
00651 |
NCD |
Coffer Dam |
1897 |
8 X 10 |
|
00652 |
NCD |
Main Foundation Showing One Years Progress |
1897 |
8 X 10 |
|
00653 |
NCD |
Structure In Progress |
1904 |
8 X 10 |
|
00654 |
NCD |
Workmen And Derricks Working Main Dam Site |
1897 |
8 X 10 |
|
00655 |
NCD |
Main Dam Site Setting Stone In Progress |
1897 |
8 X 10 |
|
00656 |
NCD |
Derricks And Men Working In Main Foundation |
1897 |
8 X 10 |
|
00657 |
NCD |
Workmen In Main Foundation |
1897 |
8 X 10 |
|
00658 |
NCD |
Main Foundation |
1897 |
8 X 10 |
|
00659 |
NCD |
Men Working In Quarry |
1897 |
8 X 10 |
|
00660 |
NCD |
Men Posing In Main Dam Site |
1897 |
8 X 10 |
|
00661 |
NCD |
Work In Quarry |
1897 |
8 X 10 |
|
00662 |
NCD |
Landslide in Quarry |
1897 |
8 X 10 |
|
00663 |
NCD |
Steam Derricks Working Main Dam Site |
1897 |
8 X 10 |
|
00664 |
NCD |
Regiment On Way To Encampment |
1898 |
5 X 7 |
|
00665 |
NCD |
During Drought Showing Oringinal Farm Foundations |
1956 |
8 X 10 |
|
00666 |
NCD |
Cavalry On Riverside Ave. Union Hotel In Background |
1900 |
8 X 10 |
|
00667 |
NCD |
View Of Encampment Of Troops During Strike |
1900 |
8 X 10 |
|
00668 |
NCD |
View Of Fields Before The Construction Began |
1889 |
8 X 10 |
|
00669 |
NCD |
View From First Hill Over Bridge Looking South |
1898 |
4 X 8 |
|
00670 |
NCD |
Little Railroad Engine Hauling Block From Quarry |
1900 |
4 X 5 |
|
00671 |
NCD |
View From Road Atop Encampment In The Hills |
4 X 11 |
||
00672 |
NCD |
View Of Diverting Ditch - With Bowery In Background |
1886 |
9 X 13 |
|
00673 |
NCD |
Overturned Wagon, Flood |
1900 |
8 X 10 |
|
00674 |
NCD |
Women And Men At Engineers Convention |
5 X 7 |
||
00675 |
NCD |
New York State Guard On Way To State Camp |
5 X 7 |
||
00676 |
NCD |
The Regiment Marching To Encampment To Quell The Strike |
1900 |
8 X 10 |
|
00677 |
NCD |
General View From Berm Of Foundation |
1897 |
8 X 10 |
|
00678 |
NCD |
Cantonment Of National Guard Troops Sent In To Quell The Strike |
1900 |
8 X 10 |
|
00679 |
NCD |
Overview Showing Tracks Going Into Quarry |
1896 |
8 X 10 |
|
00680 |
NCD |
Quarry Before Excavation |
8 X 10 |
||
00681 |
NCD |
The Bowery and Bridge |
1893 |
8 X 10 |
|
00682 |
NCD |
Picture Of Flood Washed Out Railroad Tracks |
1900 |
8 X 10 |
|
00683 |
NCD |
Men Cleaning Track At The Quarry |
1898 |
8 X 10 |
|
00684 |
NCD |
Flood |
1900 |
8 X 10 |
|
00685 |
NCD |
Riggers And Carpenters |
1892 |
8 X 10 |
|
00686 |
NCD |
Railroad Men Posing In Front Of Train |
1892 |
5 X 7 |
|
00687 |
NCD |
Men Working With Horse And Wagon |
1904 |
3 X 4 |
|
00688 |
NCD |
Some Of The Train Crews And Laborers |
1896 |
8 X 10 |
|
00689 |
NCD |
Little Engine With Engineers |
1898 |
9 X 7 |
|
00690 |
NCD |
Test Boring At Croton Lake |
1895 |
7 X 10 |
|
00691 |
NCD |
Steam Shovel And Crew Working In Pit For Fill |
1998 |
8 X 10 |
|
00692 |
NCD |
6 Men Standing By Steam Plant |
1886 |
5 X 8 |
|
00693 |
NCD |
Names Of Men In Picture 692 |
1896 |
5 X 8 |
|
00694 |
NCD |
Office Of J.B. Goldsborough |
8 X 10 |
||
00695 |
NCD |
Little Engine By Cornell Home |
1898 |
5 X 7 |
|
00696 |
NCD |
Railroad Engineers 4 Workmen |
1898 |
5 X 7 |
|
00697 |
NCD |
7th Regiment Officers Seated on Porch of Office Building |
1900 |
7 X 7 |
|
00698 |
NCD |
Cavalry In Front Of Completed Dam |
1905 |
8 X 10 |